Subscribe Member Home
Episode 410 0.5 CLP

410 – What is a Bridge Contract?

Members only

This episode is available with a Skyway membership.

See membership options Member login

Sometimes the Government’s acquisition plan doesn’t line up with the schedule for a requirement.  While there are lots of ways to meet a short term requirement,  the Contracting Officer may use a bridge contract as an option.

This is not a contract to build a bridge, rather this is a contract that bridges between the old contract and a new one.  In this episode we outline the why, how and what of a bridge contract.

Transcript

Preview
In this episode: Sometimes the Government’s acquisition plan doesn’t line up with the schedule for a requirement.  While there are lots of ways to meet a short term requirement,  the Contracting Officer may use a bridge contract as an option.This is not a…
Speaker 100:08

Today, we're talking about bridge contracts. Not not a contract for a bridge, but a specific type of contract that is sometimes called a bridge contract.

Speaker 200:18

Exactly. Yeah. A contract is it's a means to an end. Right? The contract exists to deliver something, a service, a product, software, research, some out potential outcome. However, these contracts that that they're delivering something, they're time bound. Usually, that's 5 years.

Speaker 100:38

Yeah. There's a whole lot of exceptions to that 5 years. But FAR 17 dot 204 e, among other exceptions, no. This is an exception. This is where it locks it in. 17204e says the total of the basic and option periods shall not exceed 5 years in the case of services, and then it goes on to talk about other potentialities. No? Potential situations. Wow.

The full transcript is part of membership

Members read and search every word of all 580+ episodes, with CLP credit as they listen.

See plans Member login