
421 – Pre vs Post Award Protest
Transcript
PreviewToday, we're back to a common contracting officer podcast topic, protests, which we've talked about a whole lot of times.
Protests were a a four letter word for me as a contracting officer. Yeah. One of the underlying fears of of the government team is that when the RFP is exposed to fresh air, we did an episode called Fresh Air for that reason. Yeah. But once I expose my my RFP to fresh air, industry is gonna pounce on it and criticize it and find things to protest about. Right? And so that fear can drive much of the time that it takes to get an RFP done. Because I got additional layers of people to look at it. I wanna make sure that we've triple checked everything. A lot of the rules and policies that we've added to the not we, that have been added to the FAR over the years are results of protests, are results of of the fresh air
test.
Members read and search every word of all 580+ episodes, with CLP credit as they listen.
See plans Member login