452 – Paths to Competition
Paul: One of the basic tenets of government contracting is competition. How the contracting officer competes a requirement when it's competed is part of the acquisition planning, and we talked about that in episode 436, which, of course, was called what is acquisition planning.
Kevin: The decision to compete the contract is is not taken lightly or or it shouldn't be. Right? And it's not made in a vacuum. It's not made by the contracting officer without getting input, or it shouldn't be. We should be getting input from other people as well.
The decision to compete though, it's a critical one. Because we talked about in episode 370, it was called, to compete or not to compete. And in addition to being a, I guess we'll call that a nod to Shakespeare's time. This is a critical choice in the acquisition planning because it changes many things about the path you take. We call this the keystone choice, because just for some historical reference here, the keystone is that's the top stone in an arch.
So you imagine there's a a big arch, and then there's a stone at the top of it that is held up by the rest of the arches. Well, that's the keystone.
Paul: The other way around. I think I I think the keystone is the wedge that holds up the rest of the arch. Well, I guess, look at it either way. The arch doesn't stand without the keystone. The keystone does well, isn't isn't a keystone.
It's just a stone on the ground at that point if it's not in the arch.
Kevin: See, that's why it's a great metaphor. It's like without that, you you don't have an arch. Right? So like this, the choice to compete or not to to write out the analogy here, you could have one side of the arch or or the other side, because that keystone choice, which way are we going? Are we competing or not?
Is a critical one.
Paul: Alright. We almost fell victim to the the analogy versus
Kevin: Simile or metaphor.
Paul: Yeah. You you said metaphor at one point, but I think think we're talking about an analogy. Alright. Don't get distracted. We just we just started.
Alright. To expand on the keystone choice of competition or not, we're going to dive in a little deeper here and outline the options to compete or not and the far elements around those options. Starting in far part 6, competition requirements, every acquisition the government makes is going to fall in fall follow one of 3 basic paths. It's either sole source, it's a set aside, or it's full and open competition.
Kevin: On the sole source side, like, these are the options for sole source awards that we mapped out in episode 435 and way back in episode 17, we talked about what is a justification of approval. But that's a a award justified to 1 company. Set aside, we mapped out in episodes 194 and 348 being set aside for a small business, a type of small business, overall small business, it's set aside for a type of company. And then the full and open is everything else. We covered the basics of this back in episode 91, but it's the basics of we didn't set it aside.
We're not sole sourcing it. Therefore, it's full and open. Anybody can compete on it.
Paul: Which is funny because that's the the kind of the opposite way that my brain thinks about it. And the FAR actually outlines the options in the opposite order. FAR 6.1 is full and open competition. 6.2 is full and open competition after exclusion of sources, which is a really long way to say set aside. It is set aside for a specific subset of the full and open competition world.
And far 6.3 is other than full and open competition, which is a really poor way to say sole source. Although it's it's doesn't necessarily mean just just one. There are ways besides set asides to have a smaller competition without just saying we're awarding to 1 company only.
Kevin: The beauty of this is we're trying to take the the complex to make it simple. So we're we're we're going with the highlight versions. You're absolutely right that awarding without full and open competition isn't necessarily sole source. It could be a combination of different ways to do it, but that's a whole different podcast.
Paul: The FAR doesn't give you an order of preference. But based on the language in the FAR, there is an order of preference. And the the that order of preference for these 3 competition paths is small business set aside, full and open competition, and then sole source.
Kevin: Thinking through with how each one of these works, it becomes obvious. Well, we've talked about this in lots of podcast episodes. The preference is small business awards. And so far 19.2, under the the basic way to think of this is the rule of 2. Far 19.2 says, give any option award to a small business.
As a caveat, because there are lots of rabbit trails, we're not gonna go down in this episode, but a caveat under the small business awards could be a direct award, like to an 8 a or some other type of company that's not actually competed in the same way. That falls under the small business awards. Bottom line, that's what the FAR wants. That's what the government as we as a policy, the gover the federal government wants to award the small businesses first.
Paul: When you say rule of 2, you're referring to if there are at least 2 qualified small businesses that could be awarded to, then you need to set it aside for small businesses.
Kevin: Correct.
Paul: Competition of small between small businesses.
Kevin: The the basic idea here is, I've got the basic the critical idea here is 2 capable small businesses. The fact that there are 2 companies that exist is not the same. And so the 2 that it can actually do the work, and we talk about the thinking part of the job. This is one of those moments because you need to be able to just the contracting officer needs to be able to justify, I'm setting it aside because, you know, best case you got more than 2. But the basic concept is 2, 2 companies that could do this work that are both women owned small businesses, veteran owned small businesses, or just small businesses, you set it aside to them.
Because the preference for us as an as an economy, we want the small businesses to do well. And it's less likely that they'll do well if they don't have some kind of advantage. And this is the advantage out of the gate.
Paul: Trying to pump them up and make them into larger businesses for the good of us
Kevin: all. Exactly.
Paul: If you can't find at least 2 small businesses that are qualified and capable of doing this, then you must compete full and open.
Kevin: And that's at FAR 6.101. And I'm I'm gonna read this because it's just to make the point. This paragraph b, contracting officers shall provide for full and open competition through use of competitive procedures contained in the subpart, this is part 6, that are best suited to the circumstances of the contract action and consistent with the need to fulfill the government's requirements efficiently. You could drive a truck through that. What is best suited circumstances?
What is best what is, consistent with the need to fulfill the government's requirements efficiently? Point is, if you couldn't set aside for small business, now you just gotta compete in the full and open market. That's the concept behind it.
Paul: Unless one of the exceptions in FAR 6.3 applies. There there are paths to a word to a sole source or a single source. The FAR doesn't say this is the least preferred path. Does create the most documentation to get there to get to this path. And there's only a few exclusions in far 6 dot 301 that allow you to to skip over full and open competition or small business set aside rules.
6301 says contracting without providing for full and open competition or full and open competition after exclusion of sources is a violation of statute unless permitted by one of the exceptions in 6 dot 302. And we talked about those exceptions in episode 17, what is a j and a?
Kevin: To your point, this is not the path that leads resistance. Like you said, the FAR doesn't say this is the least preferred, but the amount of effort it takes to go down this path is significantly more. So under the whole common sense of I want the bat that leads resistance, sole source is not it. And that's how I kinda came up with the order of precedence. Is it small business award first, full and open next, then a sole sole sole source awards.
Paul: Yeah. FAR makes it difficult to award to a sole source on purpose. They don't wanna leave that open to drive the truck through. Alright. Back to FAR part 6, competition requirements.
Applicability is FAR 6.001. Competition requirements apply to all contracts except here's where it's applicable and where it's not. 6 dot001 a. Contracts using contracts awarded using simplified acquisition procedures, part 13, which is generally under $250,000. Right now, that's the threshold.
Do not have to follow all of the competition requirements.
Kevin: Also, contract modifications within the scope of an existing contract. Don't have to go down one of these three paths. This includes the exercise of of priced options that were as long as they were evaluated as part of the original competition, because the original competition would have gone down one of these three paths. Right. Either it was small business, full and open, or a sole source.
Paul: Yeah. It's the within scope part of that. That's the limiter that keeps a contract from being per becoming perpetual. Right? Within scope applies to a couple different facets of of of the the contract.
So you can't have, like, a landscaping services contract and then say, well, I already have this contract. I and I need to buy a missile, so I'm just gonna buy it on the same contract. That doesn't it doesn't work that way. Same thing. You can't have a landscaping services contract for one part of your base or agency headquarters, site, what whatever you wanna call it, and then say, well, I already have a contract for landscaping services, so I'm going to use it for the entire agency across the whole country.
Kevin: And likewise, you can't use professional services for software development with your agency. And then some other agencies says, hey. Can I just add our work to that to that contract? It might be out of scope. In fact, it probably would be out of scope because you originally didn't go down one of those three paths with the scope of the contract as it was.
The reason this is worth talking about, this is different than the commercial space. A lot of times in a in a business to business contract, you just start, granted, you're not gonna buy a missile when it's the services contract for landscaping. But the scope of the number of places, a number of sites you may serve, or number of licenses you may have, like for us at Skyway, we have a license with a with a private company, or they they buy our subscription licenses to this podcast, they can add a 100 more tomorrow. It's in scope. There's no debate about that.
On the government side for them to say, hey, we competed this contract with a 1000 licenses, we're gonna add 10,000 more. That's that's out of scope. Yeah. They need to recompete it. So that that's a a key difference here.
Paul: Could be out of scope. Probably is out of scope. And we talked a lot about scope in episode 378, which is called what is contract scope. So we'll we'll wave off that one now.
Kevin: Yeah. We'll step we'll step away from that rabbit trail.
Paul: Alright. What we were talking about here is the applicability of the competition requirements. Subparagraphs d, e, and f of far 6 dot zero zero one are orders placed under requirements contracts, definite quantity contracts, and indefinite quantity contracts. Orders placed under these types of contracts are not subject to all of the competition requirements of FAR part 6.
Kevin: And that's because the original contract was awarded using one of these three paths. If you awarded an IDIQ contract that you competed, now the orders that you issue under that contract that was already competed don't need to be competed again, unless it's a multiple award contract, in which case there could the license hold sorry. The the contract holders are competing against each other for the for the work, but that's within the individual contract.
Paul: Yep. And if it is an IDIQ, which was part of FAR 16 dot 5, there's a whole fair opportunity series. We have 4 episodes, 221, 224, 226, and 229, that talk about how those competitions within the indefinite quantity base with with within the what do we call the circle of companies that have this multi award? Contract holders.
Kevin: Yeah. Or IAQ contract holders.
Paul: I'll take that.
Kevin: It's unofficial term.
Paul: Anyway, there's 4 episodes that talk about how those competitions happen. So other than these few exceptions and a couple more really fringe things that we didn't bring up here, the 3 paths of full and open, set aside, or sole source Apply. Alright. When do they apply? Acquisition, execution time zones.
This is mostly thought about as acquisition time zone stuff. Right? You have a requirement, and you need to decide how to buy it. So in the market research zone, you are likely selecting hopefully, selecting one of the 3 paths. And that leads you to release, solicitation in the RFP zone, and then award it by the rules that that you laid out in that solicitation in the selection zone.
You may also think about it in the execution time zones. In the performance zone, this is where if you had an IDIQ, you may be competing with other multi award contract holders, or you may just be responding to basically sole source, RFPs for or request for task orders or delivery orders on your contract. The other place in the execution time zones where this matters is the recompete zone. This is where the government is deciding, hey. Is what we have last time, did that work?
We still have a continuing need for this supplier service. How are we gonna buy it this time?
Kevin: Something else that may come up during the execution time zones, which we cover the execution time zones in episode 372, is this contract scope idea. Is if the contract was for grounds maintenance on this facility. That's the scope. And the amount and there were some construction done and others more facility to manage. One could argue that's within scope because the original contract was we're doing all the grounds maintenance for this entire base.
In fact, if something changed on the base, that's in scope. That decision, which is made by the contracting officer, is made during their performance zone, or they decide it's not in scope, in which case they're gonna go down a different path.
Paul: Right.
Kevin: If you're not familiar with the acquisition time zones, we cover those in episode number 3.
Paul: Alright. Specific on the government side. I think we said this multiple times. Unless the contract meets one of these exceptions. Right?
Simplified acquisition procedures, whether it's a modification, whether it's under an existing IDIQ contract, every contract needs to pick a path.
Kevin: But once we pick the path, we're stuck on that path. To say it, lovely. It's it's different difficult to move from one path to the other. Once you decided to go down the sole source path, or go down the small business path, or go down the full and open path, a lot of things change if you switch switch directions. One of the best ways to keep from having to switch directions is for government to talk to industry.
You increase the chance of a successful contract and and again, a successful mission, because the contract exists to help the agency meet the vision. You're more likely to do that by engaging with industry, because then you can better understand which one of the paths should I be going down. Is this really a sole source? Is this really a small business set aside? Is this really a full and open competition?
I made that decision in a vacuum a few times and paid for it. So that's why. And and then as of later in my career, I realized, wow. If I asked this question 2 months before I released RFP as opposed to 2 weeks before, I would get a lot more information that would help me make that decision more effectively.
Paul: And find the path of least resistance. Correct.
Kevin: And what we realize is which here's a here's a funny thing to think about, which one of these paths is actually the path of least resistance. And oftentimes, it's not the same that we did it last time. And the best way to learn that is talk to industry.
Paul: Yep. Yep. That's a great point. Industry folks, when we're talking about the paths, this is a little bit different than the way you may think about it in the commercial world. If if you're purely commercial and coming into the government world, this is completely foreign because the the three paths don't exist.
Right? You don't think about it as a small business set aside versus full and open competition versus sole source. It's either competition or it's not. Supply chain management is is really based on the same things that you use in your personal life. Right?
It's it's quality, price, delivery schedule rather than the type of business. Now you as a person or you as a company may have a preference for certain types of businesses, but it's not mandated by regulation. It's not it's not a legal thing. It's a preference. In the commercial world, past performance is still a very big thing, very big indicator of why you select suppliers.
And it can be heavily impacted by personal preferences and biases, but how someone's performed in the past matters a lot. It it in smaller businesses, especially, there might not be a formal way to collect and assess past performance. It's based on your personal feelings and and relationships with with suppliers. Regardless, competition in the commercial world is generally preferred. That that's the way you get better terms, way you get better prices.
Competition is a good thing. If you're on the government side if if you're a go if you're on the government side. We're talking about industry. If you're an industry company, if you're wow. I'm just going all around circles here.
Kevin: Let's start over.
Paul: If you're a government contractor
Kevin: There you go.
Paul: All of these things still matter. The the path matters. Right? And your job in industry is to influence the government towards whichever path leads to you. Right?
You want sole source they they order of preference is exactly the opposite. You want sole source if possible. You want it awarded directly to you without a competition. If you're a small business, you want to get it set aside for whatever type of small business you are to limit the competitors. And if you can't get one of the the subsets of set asides, just general small business set aside still helps you.
And then if you're not a small business, if you're not eligible for any set asides and you can't get to a sole source, then and only then do you prefer full and open competition. So if you're a big company in a crowded world, you want to make sure that you're influencing it towards full and open competition, not letting the government set it aside to small companies. Right?
Kevin: There's a myriad of ways this could play out too. Because a large company who can't go after it as a prime may realize they need to team with somebody. They need to team with a small business to be able to get involved with this particular opportunity. The sooner they know that that's their path, because the sooner the county officer talked to industry and industry influenced them and said, there's 15 small businesses that can do this. And then the government decides it's gonna be a small business set aside.
The sooner they get that out to the world, the better this process goes. What I did and why I was talking about the 2 weeks thing, when I told everybody I'm planning on doing this as a small business set aside 2 weeks ahead of time, turns out lots of companies thought I was gonna be falling open. They didn't have any teaming partners set up. Well, actually, the ones that did, you could tell when you got the proposal that they were much more put together. But that strategy had to be crammed into 2 weeks versus, you know, 2 months.
Yeah. And being aware of these these decisions, the sooner we make them and the more we engage with industry to make those decisions, the more effectively industry can actually solve the problems for the government through these contract team arrangements.
Paul: And I'm gonna solve a problem right now, Kevin, a problem of time. Let's wrap this one up.
Kevin: Can't get more what what's that saying that, time is free and priceless at the same time? You can't get more of it. So we're gonna save some time here. On the government side, these are core options. There are only 3 of them.
Either sole source, fallen open, or a small business set aside. You can only be on one of them unless you're gonna make a really complicated contract where I did that once. But, functionally, you're only gonna be done one of these paths. So the sooner you engage with industry and understand the impacts of each one of the paths and then choose it and then publicly tell everybody you're choosing it, the better off you're gonna be. And and and as an example, I'm starting to see some of the posts on LinkedIn from contracting officers early in the acquisition saying, we're planning on setting this aside for small business, and, yes, they're putting that in sam.gov too.
But they're putting it out to the world and getting people's input on it months before they put out the RFP, and that way they can actually get some real feedback of, yes, this is something that could be led by a small business or not. And by the way, if it's crickets, if nobody talks to them and says they can do it, well, then that's an indicator they could do it as a sole source. But all of that comes from talking early.
Paul: Yeah. That's a great point. Industry folks understand which path that your government customer can use to buy from you, and it could be a different path for different acquisitions. May not always be the same thing. Depends on what it is.
Agencies do. How big it is. Depends on the competitive field. Lots of decisions in there. It's also important to understand that the best path for them is easier to get to than the best path for only you.
Right? Best case, it's both. The the best path to get you also makes sense to them, and you can explain to them why this is the best path to them to the for the government. It just so happens that it's also best for you. Who knew?
Kevin: It just so happens that a service disabled veteran owned small business is the best path for the government, and you also happen to be one of those. Yeah. So that's the best case scenario. But if you're not communicating, you're not finding the best case no matter what. I'll add the links to this podcast episode and the far parts that we reference in here inside the podcast 2.0 forum.
If you have questions, you want more examples, that's also where they go. And if you're new to our podcast, I noticed a lot of folks are subscribing directly from their phones now. You may not even know there's a podcast 2.0 forum. To get to that forum, go to skywayacq.com and log in with the email info that you got. And right there in in the header is the podcast 2.0, and you'll see that there's a big red box.
This is podcast 2.0 forum. That's for all the you and I mentioned, I don't know, 10 different podcast episodes in this one. That's where we put we put all those notes so you don't have to sit the red lights and and and write them down yourself.
Paul: Yep. Links will be there. Alright, Kevin. I'll talk to you later.
Kevin: Alright. I'll see you, Paul.
Transcript
PreviewOne of the basic tenets of government contracting is competition. How the contracting officer competes a requirement when it's competed is part of the acquisition planning, and we talked about that in episode 436, which, of course, was called what is acquisition planning.
The decision to compete the contract is is not taken lightly or or it shouldn't be. Right? And it's not made in a vacuum. It's not made by the contracting officer without getting input, or it shouldn't be. We should be getting input from other people as well. The decision to compete though, it's a critical one. Because we talked about in episode 370, it was called, to compete or not to compete. And in addition to being a, I guess we'll call that a nod to Shakespeare's time. This is a critical choice in the acquisition planning because it changes many things about the path you take. We call this the keystone choice, because just for some historical reference here, the keystone is that's the top stone in an arch.
So you imagine there's a a big arch, and then there's a stone at the top of it that is held up by the rest of the arches. Well, that's the keystone.