560 – Overhaul of FAR Part 8 (with Shelley Hall)

Members only

This episode is available with a Skyway membership or as part of a playlist purchase.

See membership options Buy the FAR Overhaul playlist Member login

In this episode, Kevin is joined by Shelley Hall to break down one of the most important changes to federal acquisition in years: the overhaul of FAR Part 8, Required Sources of Supplies and Services. FAR Part 8 sets the rules for how agencies buy what they need and which sources must be used first. Those rules have changed in meaningful ways. Together they will explain what the overhaul really means and why it matters for everyday contracting work.

This episode goes beyond policy headlines and focuses on what contracting officers and contractors will see at the contract level. Using the WATS‑E framework, the discussion walks through what changed, what stayed the same, and how the updates affect buying decisions. The conversation also looks at the growing role of GSA and what it means for speed, documentation, and flexibility. If you want a clear, practical view of how FAR Part 8 works today—and how to operate in the current “messy middle”—this episode is for you.

----------------
SHOW NOTES

FAR Part 8 Overhaul — Key Takeaways 

Purpose & Context 
  • FAR Part 8governs required sources of supply, mandating agencies use priority sources before the open market. 
  • The overhaul is part of the broader Revolutionary FAR Overhaul (RFO), aimed at simplifying regulations and accelerating acquisitions. 
  • Substantive statutory requirements remain intact; structure, presentation, and procedures changed. 
What Changed (and What Didn’t) 

✅ What Changed 
  • Massive simplification: 
  • FAR Part 8 shrank from ~15,500 words to ~2,500. 
  • FAR 8.4 (Federal Supply Schedules) was removed from FARand relocated to GSAR/GSAM 538.71. 
  • Lifecycle-based reorganization: 
  • FAR Part 8 now follows the acquisition lifecycle more logically. 
  • Clearer mandatory-source language: 
  • Stronger “you must check” phrasing for mandatory sources before commercial buys. 
  • Reduced prescription: 
  • Detailed, step-by-step ordering mechanics were deleted from FAR and replaced with references to GSAM guidance. 
  • Greater reliance on GSA: 
  • Overhaul reinforces the shift toward GSA schedules, systems, and expertise. 
  • Required-Use Contracts clarified: 
  • A new class of OFPP “required use” contractswill be mandatory. 
  • BestinClass (BIC)contracts are prioritized but not mandatory. 
❌ What Did Not Change 
  • Statutory authorityremains unchanged (e.g., AbilityOne, FPI/UNICOR, Printing, Helium). 
  • Dollar thresholds, including the $350K SAT, did not change. 
  • Core rules for AbilityOne, FPI, and other mandatory sources remain embedded in law.  
FAR 8.4 — The Biggest Impact 
  • Old FAR 8.4 (~9,500 words) is now ~100 wordsin FAR. 
  • Agencies are directed to GSAM 538.71for: 
  • Ordering procedures 
  • Quote requirements (still ≥3 quotes above MPT) 
  • Justifications (simpler, plain-language) 
  • Many duplicative clauses (payments, disputes, inspections) were removed to avoid redundancy. 
Ecosystem Impacts 
  • FAR is treated as an ecosystem, not a checklist. 
  • Contracting Officers now exercise more judgmentrather than following prescriptive steps. 
  • NonGSA agencies must adopt the FAR deviationbefore GSAR 538.71 applies. 
Why It Matters 

For Government 
  • Faster acquisitions with fewer procedural hurdles. 
  • Less FAR text, more reliance on GSA guidance. 
  • Agencies must: 
  • Update internal policies/templates 
  • Train COs on GSAM 538.71 
  • Emphasize documentation over checklists 
For Contractors 
  • Faster awards (eventually) and clearer sourcing priorities. 
  • Increased importance of being on GSA vehicles. 
  • Streamlined, simpler quoting expected. 
  • Mandatory-source rules still apply—no shortcuts.